H160~H280總裝線主要工藝流程:
1).機(jī)座、定子搬運(yùn)上線············(2.1)
2).定子壓裝·················(2.2)
3).鉆頂絲孔·················(2.3)
4).電機(jī)出線·················(2.4)
5).電機(jī)頂升回轉(zhuǎn)90°·············(2.5)
6).吹塵工位·················(2.6)
7).穿轉(zhuǎn)子··················(2.7)
8).軸承與端蓋壓裝··············(2.8)
9).電機(jī)試驗(yàn)區(qū)測(cè)試工位(隔音房)·······(2.9)
10).安裝接線盒蓋、釘銘牌、電機(jī)上涂裝線···(2.10)
11).工裝板自動(dòng)上線移載機(jī)··········(2.11)